NSD FINLANDIA CEMEX- BERSAL

WARTSILA

PROY- 2005-2006– IRISA – IND –WARTSILA

Installation Three EG 12 MW c/u18V32 18 MW.

  • Installation of equipments auxiliaries.
  • Lube oil Mechanical installation.
  • Starting working air installation.
  • Oily water treatment installation.
  • Day tank installation
  • Fuel Oil Installation
  • Steam Installation
  • Fuel installation
  • Compressed air installation
  • Cooling Installation
  • Exhaust Gas Installation
  • Sludge Installation
  • Water Supply Installation
  • Heat Recovery installation.

Exhaust And Engine Hall Steel • Structure

  • Engine Platform.
  • Maintenance Platform.
  • Pipe Bridge Platform.
  • Maintenance Platform for Hoff Skid.
  • Tank Platform.
  • Exhaust gas pipe town.
  • Radiator Steel Structure
  • Steel Frame of Tank Platform.
  • Steel Frame of boiler Platform.
  • Compressed air system (Pipe)
  • Lube Oil System (Pipe).
  • Fuel Oil System (Pipe).
  • Raw Cooling System (Pipe).
  • Waste Oil System (Pipe).
  • Fire FIG Things System (Pipe)
  • Steam System (Pipe).
  • Stack Tower.Ductwork
  • Starting & Instrument Air System.
  • All Piping System.
  • Painting & repair painting
  • Cleaning of EG-Set and Equipment
  • Precomissioning and Start-Up Help.
  • Comissioning.

Cliente

WARTSILA

Contratista

IRISA

Localización

SAN PEDRO DE MACORIS, REP. DOM.

Año

1999-2000